Identity Statement | Context | Content and Structure | Conditions of access and use | Description control | Database


Conditions of access and use [Top]

Conditions governing access

See file level description and the CERN operational circular No 3: rules applicable to archival material and archiving at CERN. In general, records on any subject that are over 30 years old, and all records of a purely scientific nature, may be consulted.

Conditions governing reproduction

Copyright is retained by CERN, no reproduction without permission.

Language / scripts of material

Most of the material is written in English or French.

Finding aids

Listed to file level in the CERN Archives Database.

Content & Structure [Top]

Scope and content

The Large Electron Positron Collider, LEP, is a particle accelerator built inside a circular tunnel 27km round and buried 100 metres underground. At four points around the accelerator, huge detectors called ALEPH (Apparatus for LEp PHysics), DELPHI (DEtector with Lepton, Photon and Hadron Identification), L3 and OPAL (Omni Purpose Apparatus for Lep) studied what happened when electrons and their antimatter counterparts, positrons, collided at high energy.

  • ALEPH (Apparatus for LEP pHysics) was a solid-state microstrip detector and the simplest of the detectors : it had a minimum of components and emphasized performance and reliability. It was installed closest to the collision region to give information on very short-lived particles.
  • DELPHI (DEtector with Lepton Photon and Hadron Identification), ready in 1989-1990, was a special detector used to identity leptons, photons and hadrons. It incorporates a technology which had never been used on a large scale.
  • L3 (which drew its name from being the subject of the third letter of intent for a LEP experiment) was the largest of the detectors and was distinguished by having its magnet on the outside of the detector volume. It aimed for great accuracy in many of its measurements on the particles emerging from the collisions.
  • OPAL (Omni-Purpose Apparatus for LEP) was a classic polyvalent detector. Commissioned in 1989, it used tested detector techniques.

LEP was switched on in the summer of 1989. For six years, its job was to produce Z particles, carriers of one of nature's fundamental forces. The Z was first discovered in a Nobel Prize (link is external) winning CERN experiment in 1983. Z particles had been made at LEP when electrons and positrons collided with enough energy to provide their mass, around 91 GeV.

  • LEP5 – BREMS : A Single Bremsstrahlung Monitor to Measure Luminosity at LEP
  • LEP6 – MODAL : The search for Highly Ionizing Particles in e+e- collisions at LEP using (MODAL) (MOnopole Detector At Lep)

In 1995, LEP's Z era came to an end, the machine moved up a gear to 140 GeV ready for LEP's second phase which pushed the energy to over 190 GeV before the end of the decade. Known as LEP2, this second phase of LEP was to produce and study W particles, companions of the Z, which were also discovered at CERN in 1983.

LEP stopped in November 2000, but the analysis of data is still going on, with the possibility of discovering new physics phenomena.

It was dismantled in 2001 to give way to the Large Hadron Collider LHC.

LEP collection contains minutes of LPC (LEP Project Committee), LMAC ( LEP Machine Advisory Committee), MARTEC (Main Ring Technical Committee), Group Leader's meetings, LEP Management Board (LMB), reports and notes.

Spokespersons of ALEPH experiment
Approved on 18 November 1982 – Finished 21 March 2014
Jack SteinbergerFrom 1983 to February 1990
Jacques LefrançoisFrom March 1990 to 1993
Lorenzo FoàFrom 1993 to 1994
Luigi RolandiFrom 1994 to 1997
John Peter DornanFrom 1997 to March 2000
Wolf-Dieter SchlaterFrom April 2000 to March 2001
Roberto TenchiniFrom April 2001 to 2014
Spokespersons of DELPHI experiment
Approved on 18 November 1982
Ugo AmaldiFrom 1983 to 1993
Jean-Etudes AugustinFrom 1994 to 1995
Daniel TreilleFrom 1996 to 1998
Walter Anton (Wilbur) VenusFrom November 1998 to 1999
Tiziano CamporesiFrom 2000 to February 2002
Jan TimmermansFrom February 2002 to present
Spokespersons of L3 experiment
Approved on 18 November 1982 – Finished on 2 November 2010
Samuel TingFrom 1983 to 2010
Hans HoferFrom April 1999 to 2010
Spokespersons of OPAL experiment
Approved on 18 November 1982 – Finished on 2 November 2010
Aldo MicheliniFrom 1983 to 1995
Rolf HeuerFrom 1994 to August 1998
David PlaneFrom September 1996 to 2010
Spokespersons of BREMS experiment
Approved on 6 April 1989 – Finished on 6 April 1999
Giordano Diambrini-PalazziFrom 1989 to 1999
Spokespersons of MODAL experiment
Approved on 27 September 1989 – Finished on 18 February 2002
James PinfoldFrom 1989 to 2002

Appraisal, destruction and scheduling information

Nothing was destroyed.

Accruals

Further accruals may be received.

System of arrangement

The original order has been preserved. For the purposes of cataloguing the files have been described according to the following plan:

CERN-ARCH-LEP-1-01Administration and general
CERN-ARCH-LEP-1-02Safety
CERN-ARCH-LEP-1-03LEP Committees and Working Groups
CERN-ARCH-LEP-1-04LEP Reports and notes
CERN-ARCH-LEP-1-05LEP experiments Committee (LEPC) and LEP experiments

For the purposes of cataloguing the files have been described according to the following plan:

CERN-ARCH-LEP-2-01Specifications
CERN-ARCH-LEP-2-02Notes and Internal notes
CERN-ARCH-LEP-2-03Meetings
CERN-ARCH-LEP-2-04Files of Emilio Picasso – LEP Project Director (1981-1989)
CERN-ARCH-LEP-2-05Files of Günther Plass – Deputy to LEP Project leader (1981-1989), LEP Division leader (1983-1989), Director of Accelerators (1990-1993)
CERN-ARCH-LEP-2-06Files of Manfred Buhler-Broglin – Administrateur du projet LHC,Chargé par le Directeur-Général de la procédure DUP (Déclaration d'Utilité Publique)
CERN-ARCH-LEP-2-07Files of Pierre C. Troendle – Service of Local Affairs
CERN-ARCH-LEP-2-08Files of L. Gignoux – – Service of Local Affairs for the LEP Project
CERN-ARCH-LEP-2-09Files of Robert Lévy-Mandel – Assistant to LEP Project Leader on questions of security
CERN-ARCH-LEP-2-10Files of Oscar Barbalat – Group leader of Industry and Technology Liaison Office (ITLO),1992-1997
CERN-ARCH-LEP-2-11Files of Kurt Hübner – Director of Accelerators (1994-2001)
CERN-ARCH-LEP-2-12Files of Carlo Wyss – Deputy for the LEP200 project
CERN-ARCH-LEP-2-13Files of F. Ferger and Stuart Turner
CERN-ARCH-LEP-2-14Files of Alain Brissonnaud
CERN-ARCH-LEP-2-15Permis de construire, DUP, Etude d'impact, Etude géologique, …
CERN-ARCH-LEP-2-16Arbitrage CERN – EUROLEP
CERN-ARCH-LEP-2-17Photos
CERN-ARCH-LEP-2-18Magnets measurements
CERN-ARCH-LEP-2-19Chrono
CERN-ARCH-LEP-2-20Files of LEP Secretariat
CERN-ARCH-LEP-2-21LEP Fest – 9-11 October 2000

Context [Top]

Name of creator

Large Electron Positron Collider Division, LEP

Administrative

  • 1976 : Start of LEP design studies
  • 1978 : First practical design was published
  • 1981 : Council approved construction for an initial operating energy of 50 GeV per beam; Emilio Picasso named as LEP Project Director until 1989
  • 1983 : Ground-breaking ceremony for LEP; G. Plass named as LEP Division Leader until 1989
  • 1989 : Inauguration of LEP
  • 1990 : G. Plass named as Director of Accelerators, and L. R. Evans became SL (LEP+SPS) Division Leader
  • 1994 : K. H. Kissler became the new SL (LEP+SPS) Division leader
  • 1996 : LEP energy is increased to allow production of pairs of W particles (140 GeV)
  • 2000 : LEP accelerator, achieving a collision energy of 209 GeV, closed in November. S. Myers became the new SL (LEP+SPS) Division leader until 2002.

Immediate source of acquisition or transfer

Roger Calder in July 1993 and the Libray in 2004

Description control [Top]

Archivist's note

Description prepared by Maryse Moskofian

Date(s) of description

Geneva, the 10th September 2003, Revised 2007, 2017, 2026

Identity Statement [Top]

Reference code(s)

CERN-ARCH-LEP-1-01-001 to CERN-ARCH-LEP-1-05-025

CERN-ARCH-LEP-2-01-001 to CERN-ARCH-LEP-2-20-004

Title

Archives of Large Electron Positron Collider Division and Committee, LEP and LEPC

Date(s)

1978 – 2008

Level of description

Sub-fonds

Extent of the unit of description

73 Boxes, 129 items, 8 linear metres (1st accession)

396 Boxes, 791 items, 44 linear metres (2nd accession)